United States › Grid › Interconnection queues › South Carolina
SOLAR · SOUTHEASTSolar project 917739, Marion County
Solar project 917739, Marion County is a 63.9 MW solar request in interconnection study in the Southeast interconnection queue, in Marion County, South Carolina, connecting to Duke Energy Progress.
- PlanningQueued Sep 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- Operating (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 917739
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Progress
- Connection point (POI)
- FLORENCE DUPONT - MARION 115KV
- Location
- Marion County, South Carolina
- Technology
- Solar: 63.9 MW
- Total requested
- 63.9 MW
- Service type
- Other
- Study phase
- Facility Study - In Progress
- Queue status
- Active
- Entered queue
- 27 September 2023
Location
Marker shows the centre of Marion County; the queue data does not give exact sites.
Power plants in South Carolina · Transmission lines in South Carolina
Other requests in Marion County
- Solar project 21892, Marion CountySolar · 2.0 MW · under construction
- Solar project 282, Marion CountySolar · 120 MW · in study
- Solar project 238, Marion CountySolar · 75.0 MW · in study
- Other project PP00056, Marion CountyOther · 74.9 MW · in study
- Solar project 962968, Marion CountySolar · 74.9 MW · in study
- Other project PP00029, Marion CountyOther · 63.9 MW · in study
- Solar project 239, Marion CountySolar · 55.0 MW · in study
- Solar project 977878, Marion CountySolar · 3.2 MW · in study
- Solar project 956474, Marion CountySolar · 1.9 MW · in study
- Solar project 20832, Marion CountySolar · 2.0 MW · built
- Solar project 146, Marion CountySolar · 400 MW · withdrawn
- Solar project 260, Marion CountySolar · 250 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem