United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
SOLAR Β· MISOSolar project MPC04200, Clearwater County
Solar project MPC04200, Clearwater County is a 154 MW solar request withdrawn in the MISO interconnection queue, in Clearwater County, Minnesota, connecting to Minnkota Power Cooperative.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- MPC04200
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Minnkota Power Cooperative
- Connection point (POI)
- Winger-Walton 230 kV
- Location
- Clearwater County, Minnesota
- Technology
- Solar: 154 MW
- Total requested
- 154 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 22 November 2020
- Proposed online date
- October 2024
Location
Marker shows the centre of Clearwater County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Clearwater County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem