πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

SOLAR Β· MISO

Solar project MPC04200, Clearwater County

Solar project MPC04200, Clearwater County is a 154 MW solar request withdrawn in the MISO interconnection queue, in Clearwater County, Minnesota, connecting to Minnkota Power Cooperative.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
MPC04200
Grid region
MISO (Midcontinent)
Utility / transmission owner
Minnkota Power Cooperative
Connection point (POI)
Winger-Walton 230 kV
Location
Clearwater County, Minnesota
Technology
Solar: 154 MW
Total requested
154 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
22 November 2020
Proposed online date
October 2024

Location

Marker shows the centre of Clearwater County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Clearwater County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem