OTHER Β· PJMOther project Y2-047
Other project Y2-047 is a 200 MW other request withdrawn in the PJM interconnection queue, connecting to PECO.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2012 (completed)
- Withdrawn / abandonedJul 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Y2-047
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PECO
- Connection point (POI)
- Peach Bottom-BGE
- Technology
- Other: 200 MW
- Total requested
- 200 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 6 August 2012
- Proposed online date
- January 2013
- Withdrawn
- July 2015
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem