OTHER Β· PJM

Other project Y2-047

Other project Y2-047 is a 200 MW other request withdrawn in the PJM interconnection queue, connecting to PECO.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2012 (completed)
  2. Withdrawn / abandonedJul 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Y2-047
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PECO
Connection point (POI)
Peach Bottom-BGE
Technology
Other: 200 MW
Total requested
200 MW
Service type
Energy only (ERIS)
Study phase
Available studies: System Impact Study
Queue status
Withdrawn
Entered queue
6 August 2012
Proposed online date
January 2013
Withdrawn
July 2015

Location

No county location in the queue data.

Power plants in Β· Transmission lines in