United States β€Ί Grid β€Ί Interconnection queues β€Ί Colorado

SOLAR + STORAGE Β· WEST

Solar + storage project GI-CS-2025-13, Weld County

Solar + storage project GI-CS-2025-13, Weld County is a 97.0 MW solar + storage request withdrawn in the West interconnection queue, in Weld County, Colorado, connecting to Tri-State Generation and Transmission Association.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2025 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-CS-2025-13
Grid region
West (non-ISO utilities)
Utility / transmission owner
Tri-State Generation and Transmission Association
Connection point (POI)
Rockport-Ponnequin 115kV Line
Location
Weld County, Colorado
Technology
Solar: 97.0 MW Β· Battery
Total requested
97.0 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
25 September 2025
Proposed online date
December 2028

Location

Marker shows the centre of Weld County; the queue data does not give exact sites.

Power plants in Colorado Β· Transmission lines in Colorado

Other requests in Weld County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem