United States βΊ Grid βΊ Interconnection queues βΊ Kentucky
ONSHORE WIND Β· PJMOnshore wind project Y3-031A_EKPC2
Onshore wind project Y3-031A_EKPC2 is a 150 MW onshore wind request withdrawn in the PJM interconnection queue, connecting to EKPC.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2013 (completed)
- Withdrawn / abandonedMay 2014 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Y3-031A_EKPC2
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- EKPC
- Connection point (POI)
- Flemingsburg 138 KV
- Location
- Kentucky
- Technology
- Wind: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 11 February 2013
- Proposed online date
- December 2015
- Withdrawn
- May 2014
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem