πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Michigan

SOLAR Β· MISO

Solar project J1949, Antrim County

Solar project J1949, Antrim County is a 99.6 MW solar request withdrawn in the MISO interconnection queue, in Antrim County, Michigan, connecting to METC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2021 (completed)
  2. Withdrawn / abandonedSep 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1949
Grid region
MISO (Midcontinent)
Utility / transmission owner
METC
Connection point (POI)
Mancelona - Westwood 69kV
Location
Antrim County, Michigan
Technology
Solar: 99.6 MW
Total requested
99.6 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 3; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
22 August 2021
Proposed online date
November 2023
Withdrawn
September 2023

Location

Marker shows the centre of Antrim County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Other requests in Antrim County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem