πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· SOUTHEAST

Solar project 201

Solar project 201 is a 75.0 MW solar request built and operating in the Southeast interconnection queue.

Queue statusOperating
  1. PlanningQueued Sep 2016 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJan 2019 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
201
Grid region
Southeast (non-ISO utilities)
Connection point (POI)
Columbia-Suwannee (DEF) 115kV
Technology
Solar: 75.0 MW
Total requested
75.0 MW
Service type
Network resource (NRIS)
Study phase
Operational
Queue status
Operational
Entered queue
19 September 2016
Came online
January 2019

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem