🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Virginia

BATTERY STORAGE · PJM

Hampton BESS 3

Hampton BESS 3 is a 100 MW battery storage request withdrawn in the PJM interconnection queue, in City Of Hampton County, Virginia, connecting to Dominion.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2025 (completed)
  2. Withdrawn / abandonedNov 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG2-010
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Developer
Delorean Power LLC dba Lightshift Energy
Connection point (POI)
Peninsula-Whealton 115 kV
Location
City Of Hampton County, Virginia
Technology
Battery: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
24 February 2025
Proposed online date
January 2023
Withdrawn
November 2025

Location

Marker shows the centre of City Of Hampton County; the queue data does not give exact sites.

Power plants in Virginia · Transmission lines in Virginia

Other requests in City Of Hampton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem