United States › Grid › Interconnection queues › Virginia
BATTERY STORAGE · PJMHampton BESS 3
Hampton BESS 3 is a 100 MW battery storage request withdrawn in the PJM interconnection queue, in City Of Hampton County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2025 (completed)
- Withdrawn / abandonedNov 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-010
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Developer
- Delorean Power LLC dba Lightshift Energy
- Connection point (POI)
- Peninsula-Whealton 115 kV
- Location
- City Of Hampton County, Virginia
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 24 February 2025
- Proposed online date
- January 2023
- Withdrawn
- November 2025
Location
Marker shows the centre of City Of Hampton County; the queue data does not give exact sites.
Other requests in City Of Hampton County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem