United States βΊ Grid βΊ Interconnection queues βΊ Iowa
ONSHORE WIND Β· MISOOnshore wind project J2950, Clay County
Onshore wind project J2950, Clay County is a 299 MW onshore wind request withdrawn in the MISO interconnection queue, in Clay County, Iowa, connecting to MIDAMERICAN ENERGY CO..
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2950
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- MIDAMERICAN ENERGY CO.
- Connection point (POI)
- Clay County
- Location
- Clay County, Iowa
- Technology
- Wind: 299 MW
- Total requested
- 299 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 15 September 2022
- Proposed online date
- September 2018
- Withdrawn
- October 2025
Location
Marker shows the centre of Clay County; the queue data does not give exact sites.
Other requests in Clay County
- Onshore wind project J455, Clay CountyOnshore wind Β· 300 MW Β· built
- Gas project GI-0213, Clay CountyGas Β· 40.0 MW Β· built
- Other project GI-0301, Clay CountyOther Β· 5.4 MW Β· built
- Onshore wind project J3920, Clay CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project G948, Clay CountyOnshore wind Β· 250 MW Β· withdrawn
- Onshore wind project R67, Clay CountyOnshore wind Β· 149 MW Β· withdrawn
- Other project GI-0216, Clay CountyOther Β· 4.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem