United States βΊ Grid βΊ Interconnection queues βΊ Montana
HYDRO Β· WESTHydro project 399, Lewis And Clark County
Hydro project 399, Lewis And Clark County is a 5.4 MW hydro request withdrawn in the West interconnection queue, in Lewis And Clark County, Montana, connecting to NorthWestern Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 399
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NorthWestern Energy
- Connection point (POI)
- Wolf Creek, Montana
- Location
- Lewis And Clark County, Montana
- Technology
- Hydro: 5.4 MW
- Total requested
- 5.4 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 3 December 2020
- Proposed online date
- October 2021
Location
Marker shows the centre of Lewis And Clark County; the queue data does not give exact sites.
Other requests in Lewis And Clark County
- Gas project 441, Lewis And Clark CountyGas Β· 12.0 MW Β· in study
- Solar + storage project 440, Lewis And Clark CountySolar + storage Β· 4.6 MW Β· in study
- Hydro project 457, Lewis And Clark CountyHydro Β· 2.2 MW Β· in study
- Hydro project 402, Lewis And Clark CountyHydro Β· 21.6 MW Β· built
- Solar project 179, Lewis And Clark CountySolar Β· 3.0 MW Β· built
- Solar project 204, Lewis And Clark CountySolar Β· 3.0 MW Β· built
- Hydro project 339, Lewis And Clark CountyHydro Β· 2.7 MW Β· built
- Battery storage project 452, Lewis And Clark CountyBattery storage Β· 200 MW Β· withdrawn
- Gas project 173, Lewis And Clark CountyGas Β· 60.0 MW Β· withdrawn
- Battery storage project 385, Lewis And Clark CountyBattery storage Β· 30.0 MW Β· withdrawn
- Hydro project GI-1504, Lewis And Clark CountyHydro Β· 8.0 MW Β· withdrawn
- Solar project 174, Lewis And Clark CountySolar Β· 6.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem