SOLAR Β· MISOSolar project J1920, Leelanau County
Solar project J1920, Leelanau County is a 125 MW solar request withdrawn in the MISO interconnection queue, in Leelanau County, Michigan, connecting to ITC.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandonedSep 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1920
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC
- Connection point (POI)
- Tuscola-Arrowhead 120kV Transmission Line
- Location
- Leelanau County, Michigan
- Technology
- Solar: 125 MW
- Total requested
- 125 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 3; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 22 August 2021
- Proposed online date
- November 2023
- Withdrawn
- September 2023
Location
Marker shows the centre of Leelanau County; the queue data does not give exact sites.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem