Solar project J1920, Leelanau County

Solar project J1920, Leelanau County is a 125 MW solar request withdrawn in the MISO interconnection queue, in Leelanau County, Michigan, connecting to ITC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2021 (completed)
  2. Withdrawn / abandonedSep 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1920
Grid region
MISO (Midcontinent)
Utility / transmission owner
ITC
Connection point (POI)
Tuscola-Arrowhead 120kV Transmission Line
Location
Leelanau County, Michigan
Technology
Solar: 125 MW
Total requested
125 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 3; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
22 August 2021
Proposed online date
November 2023
Withdrawn
September 2023

Location

Marker shows the centre of Leelanau County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem