United States βΊ Grid βΊ Interconnection queues βΊ New York
ONSHORE WIND Β· NYISOFlat Rock Wind Power 230 kV
Flat Rock Wind Power 230 kV is a 240 MW onshore wind request withdrawn in the NYISO interconnection queue, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2002 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 128
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- Flat Rock Wind Power, LLC
- Connection point (POI)
- Adirondack-Porter line
- Location
- New York
- Technology
- Wind: 240 MW
- Total requested
- 240 MW
- Queue status
- Withdrawn
- Entered queue
- 20 November 2002
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem