United States β€Ί Grid β€Ί Interconnection queues β€Ί New York

ONSHORE WIND Β· NYISO

Flat Rock Wind Power 230 kV

Flat Rock Wind Power 230 kV is a 240 MW onshore wind request withdrawn in the NYISO interconnection queue, connecting to NM-NG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2002 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
128
Grid region
NYISO (New York)
Utility / transmission owner
NM-NG
Developer
Flat Rock Wind Power, LLC
Connection point (POI)
Adirondack-Porter line
Location
New York
Technology
Wind: 240 MW
Total requested
240 MW
Queue status
Withdrawn
Entered queue
20 November 2002

Location

No county location in the queue data.

Power plants in New York Β· Transmission lines in New York

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem