United States βΊ Grid βΊ Interconnection queues βΊ Kentucky
SOLAR + STORAGE Β· PJMSolar + storage project AG2-666, Jackson County
Solar + storage project AG2-666, Jackson County is a 90.0 MW solar + storage request withdrawn in the PJM interconnection queue, in Jackson County, Kentucky, connecting to EKPC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-666
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- EKPC
- Connection point (POI)
- Spurlock - Flemingsburg 138 kV
- Location
- Jackson County, Kentucky
- Technology
- Solar: 90.0 MW Β· Battery
- Total requested
- 90.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 31 March 2021
- Proposed online date
- December 2023
- Withdrawn
- December 2024
Location
Marker shows the centre of Jackson County; the queue data does not give exact sites.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem