ONSHORE WIND Β· WEST

Onshore wind project 2010-G4

Onshore wind project 2010-G4 is a 60.0 MW onshore wind request withdrawn in the West interconnection queue, connecting to WAPA Rocky Mountain Region.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2010 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2010-G4
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA Rocky Mountain Region
Connection point (POI)
Archer-Sidney 115-kV
Technology
Wind: 60.0 MW
Total requested
60.0 MW
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
22 September 2010
Proposed online date
September 2017

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem