United States β€Ί Grid β€Ί Interconnection queues β€Ί Kentucky

SOLAR Β· PJM

Solar project AH1-330

Solar project AH1-330 is a 100 MW solar request withdrawn in the PJM interconnection queue, connecting to EKPC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandonedDec 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AH1-330
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
EKPC
Connection point (POI)
Tyner - McKee 69 kV
Location
Kentucky
Technology
Solar: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
10 September 2021
Proposed online date
December 2025
Withdrawn
December 2024

Location

No county location in the queue data.

Power plants in Kentucky Β· Transmission lines in Kentucky

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem