United States βΊ Grid βΊ Interconnection queues
HYDRO Β· WESTHydro project 59
Hydro project 59 is a 2.2 MW hydro request withdrawn in the West interconnection queue, connecting to NorthWestern Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2007 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 59
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NorthWestern Energy
- Connection point (POI)
- Need more information
- Technology
- Hydro: 2.2 MW
- Total requested
- 2.2 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 17 April 2007
- Proposed online date
- October 2007
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem