United States βΊ Grid βΊ Interconnection queues
OTHER Β· PJMOther project AD1-086
Other project AD1-086 is a 23.9 MW other request withdrawn in the PJM interconnection queue, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2017 (completed)
- Withdrawn / abandonedAug 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AD1-086
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- E. Frankfort-Goodings Grove
- Technology
- Other: 23.9 MW
- Total requested
- 23.9 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: System Impact Study, Facilities Study
- Queue status
- Withdrawn
- Entered queue
- 15 September 2017
- Proposed online date
- June 2021
- Withdrawn
- August 2021
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem