ONSHORE WIND Β· ISO-NECape Wind Turbine Generators
Cape Wind Turbine Generators is a 454 MW onshore wind request withdrawn in the ISO-NE interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2001 (completed)
- Withdrawn / abandonedJan 2017 (project stopped here)
- ConsentedNov 2015 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 89
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Near Barnstable 115 kV Substation
- Location
- Massachusetts
- Technology
- Wind: 454 MW
- Total requested
- 454 MW
- Service type
- Energy only (ERIS)
- Study phase
- Executed
- Queue status
- Withdrawn
- Entered queue
- 6 June 2001
- Agreement signed
- 3 November 2015
- Proposed online date
- December 2018
- Withdrawn
- January 2017
Location
No county location in the queue data.
Power plants in Massachusetts Β· Transmission lines in Massachusetts
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem