United States β€Ί Grid β€Ί Interconnection queues β€Ί Missouri

SOLAR Β· SPP

Solar project GEN-2018-084, Linn County

Solar project GEN-2018-084, Linn County is a 80.0 MW solar request withdrawn in the SPP interconnection queue, in Linn County, Missouri, connecting to GMO.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2018 (completed)
  2. Withdrawn / abandonedMay 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2018-084
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
GMO
Connection point (POI)
Archie 161kV substation
Location
Linn County, Missouri
Technology
Solar: 80.0 MW
Total requested
80.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
19 November 2018
Proposed online date
December 2023
Withdrawn
May 2022

Location

Marker shows the centre of Linn County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem