SOLAR Β· SPPSolar project GEN-2018-084, Linn County
Solar project GEN-2018-084, Linn County is a 80.0 MW solar request withdrawn in the SPP interconnection queue, in Linn County, Missouri, connecting to GMO.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2018 (completed)
- Withdrawn / abandonedMay 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2018-084
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- GMO
- Connection point (POI)
- Archie 161kV substation
- Location
- Linn County, Missouri
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 19 November 2018
- Proposed online date
- December 2023
- Withdrawn
- May 2022