ONSHORE WIND Β· WEST

Onshore wind project 2006-G2

Onshore wind project 2006-G2 is a 101 MW onshore wind request withdrawn in the West interconnection queue, connecting to WAPA Rocky Mountain Region.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2006 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2006-G2
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA Rocky Mountain Region
Connection point (POI)
Archer-Hayden line
Technology
Wind: 101 MW
Total requested
101 MW
Study phase
Removed from Queue
Queue status
Withdrawn
Entered queue
20 April 2006
Proposed online date
December 2013

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem