United States βΊ Grid βΊ Interconnection queues βΊ Colorado
ONSHORE WIND Β· WESTOnshore wind project GI-2004-6, Washington County
Onshore wind project GI-2004-6, Washington County is a 250 MW onshore wind request withdrawn in the West interconnection queue, in Washington County, Colorado, connecting to Public Service Company Of Colorado.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2004 (completed)
- Withdrawn / abandonedOct 2009 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-2004-6
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Public Service Company Of Colorado
- Connection point (POI)
- Pawnee Substation
- Location
- Washington County, Colorado
- Technology
- Wind: 250 MW
- Total requested
- 250 MW
- Service type
- NRIS and ERIS
- Study phase
- Feasibility Study complete System Impact Study complete Facilities Study complete Signed LGIA Terminated 10/8/09
- Queue status
- Withdrawn
- Entered queue
- 16 August 2004
- Proposed online date
- December 2006
- Withdrawn
- October 2009
Location
Marker shows the centre of Washington County; the queue data does not give exact sites.
Other requests in Washington County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem