Barrelhead is a 54.0 MW solar request with a signed interconnection agreement in the PJM interconnection queue, connecting to EKPC.
Queue statusConsented
- PlanningQueued Sep 2020 (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingTarget Jan 2029 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- AG1-471
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- EKPC
- Developer
- Barrelhead Solar, LLC
- Connection point (POI)
- Up Church-Wayne County 69 kV
- Location
- Kentucky
- Technology
- Solar: 54.0 MW
- Total requested
- 54.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Active
- Entered queue
- 30 September 2020
- Proposed online date
- January 2029