United States βΊ Grid βΊ Interconnection queues βΊ Colorado
SOLAR Β· WESTSolar project GI-2016-28, Mesa County
Solar project GI-2016-28, Mesa County is a 51.8 MW solar request withdrawn in the West interconnection queue, in Mesa County, Colorado, connecting to Public Service Company Of Colorado.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2016 (completed)
- Withdrawn / abandonedJan 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-2016-28
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Public Service Company Of Colorado
- Connection point (POI)
- Collbran Substation 138 kV
- Location
- Mesa County, Colorado
- Technology
- Solar: 51.8 MW
- Total requested
- 51.8 MW
- Service type
- NRIS and ERIS
- Study phase
- Feasibility Study Complete System Impact Study Underway Request Withdrawn 01/06/2020
- Queue status
- Withdrawn
- Entered queue
- 22 November 2016
- Proposed online date
- December 2019
- Withdrawn
- January 2020
Location
Marker shows the centre of Mesa County; the queue data does not give exact sites.
Other requests in Mesa County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem