SOLAR Β· SOUTHEASTSolar project 453, Christian County
Solar project 453, Christian County is a 125 MW solar request withdrawn in the Southeast interconnection queue, in Christian County, Kentucky, connecting to Tennessee Valley Authority.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 453
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Tennessee Valley Authority
- Location
- Christian County, Kentucky
- Technology
- Solar: 125 MW
- Total requested
- 125 MW
- Queue status
- Withdrawn
- Entered queue
- 10 August 2020
- Proposed online date
- July 2028
Location
Marker shows the centre of Christian County; the queue data does not give exact sites.
Other requests in Christian County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem