SOLAR Β· ERCOT

Philosun

Philosun is a 127 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2018 (completed)
  2. Withdrawn / abandonedOct 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
19INR0168
Grid region
ERCOT (Texas)
Developer
Alpin Sun
Connection point (POI)
tap 345kV 1906 Venus - 68090 Sam Switch
Technology
Solar: 127 MW
Total requested
127 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
2 March 2018
Proposed online date
June 2020
Withdrawn
October 2018

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem