United States βΊ Grid βΊ Interconnection queues
OTHER Β· PJMOther project AA1-090
Other project AA1-090 is a 565 MW other request withdrawn in the PJM interconnection queue, connecting to DL.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2014 (completed)
- Withdrawn / abandonedMay 2016 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AA1-090
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DL
- Connection point (POI)
- Cheswick 24kV Unit 1-AEP-Dayton HUB
- Technology
- Other: 565 MW
- Total requested
- 565 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 29 October 2014
- Withdrawn
- May 2016
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem