United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
OTHER Β· SOUTHEASTOther project 3, Lowndes County
Other project 3, Lowndes County is a 1,170 MW other request withdrawn in the Southeast interconnection queue, in Lowndes County, Mississippi, connecting to Tennessee Valley Authority.
Queue statusWithdrawn / abandoned
- PlanningQueued May 1998 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 3
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Tennessee Valley Authority
- Location
- Lowndes County, Mississippi
- Technology
- Other: 1,170 MW
- Total requested
- 1,170 MW
- Queue status
- Withdrawn
- Entered queue
- 19 May 1998
Location
Marker shows the centre of Lowndes County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Lowndes County
- Gas project 569, Lowndes CountyGas Β· 620 MW Β· in study
- Battery storage project 25RSC-013, Lowndes CountyBattery storage Β· 200 MW Β· in study
- Other project 53, Lowndes CountyOther Β· 900 MW Β· built
- Other project 53Other Β· 900 MW Β· built
- Lone Oak Energy Center(Calpine)Gas Β· 813 MW Β· built
- Caledonia Generating (Cogentrix)Gas Β· 813 MW Β· built
- Other project 15, Lowndes CountyOther Β· 450 MW Β· built
- Other project 15Other Β· 450 MW Β· built
- Gas project 223, Lowndes CountyGas Β· 122 MW Β· built
- Solar project 341, Lowndes CountySolar Β· 100 MW Β· built
- Solar project 415, Lowndes CountySolar Β· 100 MW Β· built
- Solar project 377, Lowndes CountySolar Β· 100 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem