United States β€Ί Grid β€Ί Interconnection queues

OTHER Β· MISO

Surplus

Surplus is a 75.0 MW other request withdrawn in the MISO interconnection queue.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
100141
Grid region
MISO (Midcontinent)
Technology
Other: 75.0 MW
Total requested
75.0 MW
Queue status
Withdrawn

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem