United States βΊ Grid βΊ Interconnection queues
OTHER Β· MISOSurplus; Pine River Solar
Surplus; Pine River Solar is a 80.0 MW other request withdrawn in the MISO interconnection queue, connecting to METC.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2021 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- S1012
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- METC
- Connection point (POI)
- Luce 138 kV Sub(256594)
- Technology
- Solar: 80.0 MW Β· Other
- Total requested
- 80.0 MW
- Queue status
- Withdrawn
- Entered queue
- 15 October 2021
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem