United States βΊ Grid βΊ Interconnection queues βΊ Virginia
OTHER Β· PJMYorktown 3
Yorktown 3 is a 20.0 MW other request withdrawn in the PJM interconnection queue, in York County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2007 (completed)
- Withdrawn / abandonedJul 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- T06
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Yorktown 230kV
- Location
- York County, Virginia
- Technology
- Oil: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Withdrawn
- Entered queue
- 3 August 2007
- Proposed online date
- May 2014
- Withdrawn
- July 2012
Location
Marker shows the centre of York County; the queue data does not give exact sites.
Other requests in York County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem