πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

OTHER Β· PJM

Other project Z1-084

Other project Z1-084 is a 475 MW other request withdrawn in the PJM interconnection queue, connecting to ComEd.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2013 (completed)
  2. Withdrawn / abandonedMar 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Z1-084
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Connection point (POI)
Quad Cities 1-NI Hub
Technology
Other: 475 MW
Total requested
475 MW
Service type
Energy only (ERIS)
Study phase
Available studies: System Impact Study
Queue status
Withdrawn
Entered queue
30 October 2013
Withdrawn
March 2015

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem