OTHER Β· PJM

Other project AF2-015

Other project AF2-015 is a 50.0 MW other request withdrawn in the PJM interconnection queue, connecting to PSEG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2019 (completed)
  2. Withdrawn / abandonedJul 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AF2-015
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PSEG
Connection point (POI)
Essex-McCarter 230 kV
Technology
Other: 50.0 MW
Total requested
50.0 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
23 October 2019
Proposed online date
October 2019
Withdrawn
July 2021

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem