United States βΊ Grid βΊ Interconnection queues
OTHER Β· PJMOther project AF2-015
Other project AF2-015 is a 50.0 MW other request withdrawn in the PJM interconnection queue, connecting to PSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2019 (completed)
- Withdrawn / abandonedJul 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF2-015
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PSEG
- Connection point (POI)
- Essex-McCarter 230 kV
- Technology
- Other: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 23 October 2019
- Proposed online date
- October 2019
- Withdrawn
- July 2021
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem