United States β€Ί Grid β€Ί Interconnection queues

OTHER Β· WEST

Other project 2023-G5.1

Other project 2023-G5.1 is a 400 MW other request withdrawn in the West interconnection queue, connecting to WAPA Rocky Mountain Region.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2023-G5.1
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA Rocky Mountain Region
Connection point (POI)
Flagstaff - Pinnacle Peak 345-kV
Technology
Solar: 400 MW Β· Wind Β· Battery
Total requested
400 MW
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
26 March 2023
Proposed online date
December 2027

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem