United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR Β· PJMSolar project AG1-022, Albemarle County
Solar project AG1-022, Albemarle County is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Albemarle County, Virginia, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2020 (completed)
- Withdrawn / abandonedJan 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG1-022
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Developer
- Vista Energy Facility, LLC
- Connection point (POI)
- Scottsville-Colleen 138 kV
- Location
- Albemarle County, Virginia
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 26 May 2020
- Proposed online date
- December 2023
- Withdrawn
- January 2025
Location
Marker shows the centre of Albemarle County; the queue data does not give exact sites.
Other requests in Albemarle County
- Woodridge SolarSolar Β· 138 MW Β· agreement signed
- Solar project AF1-323, Albemarle CountySolar Β· 55.0 MW Β· withdrawn
- Solar project AI1-125, Albemarle CountySolar Β· 22.0 MW Β· withdrawn
- Solar project AF2-302, Albemarle CountySolar Β· 20.0 MW Β· withdrawn
- Rivanna SolarSolar Β· 12.5 MW Β· withdrawn
- Solar project AD1-040, Albemarle CountySolar Β· 11.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem