United States β€Ί Grid β€Ί Interconnection queues β€Ί Massachusetts

OFFSHORE WIND Β· ISO-NE

Offshore Wind

Offshore Wind is a 814 MW offshore wind request withdrawn in the ISO-NE interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2019 (completed)
  2. Withdrawn / abandonedFeb 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
909
Grid region
ISO-NE (New England)
Connection point (POI)
Primary National Grid 115kV Bell Rock, alt: Eversource 115kV Wings Lane, National Grid 115kV Somerset
Location
Massachusetts
Technology
Offshore Wind: 814 MW
Total requested
814 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 August 2019
Proposed online date
May 2026
Withdrawn
February 2024

Location

No county location in the queue data.

Power plants in Massachusetts Β· Transmission lines in Massachusetts