United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR Β· PJMSolar project AG2-051, Louisa County
Solar project AG2-051, Louisa County is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Louisa County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2020 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-051
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- St. Johns DP 115 kV
- Location
- Louisa County, Virginia
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 2 December 2020
- Proposed online date
- March 2023
- Withdrawn
- December 2024
Location
Marker shows the centre of Louisa County; the queue data does not give exact sites.
Other requests in Louisa County
- Horsepen Branch SolarSolar + storage Β· 20.0 MW Β· agreement signed
- Turkey SolarSolar Β· 14.0 MW Β· agreement signed
- Battery storage project AI2-042, Louisa CountyBattery storage Β· 50.0 MW Β· in study
- Solar project AI2-153, Louisa CountySolar Β· 32.0 MW Β· in study
- Belcher SolarSolar Β· 88.2 MW Β· built
- North Anna Unit 1Nuclear Β· 65.0 MW Β· built
- North Anna Unit 2Nuclear Β· 65.0 MW Β· built
- North Anna Unit 1Nuclear Β· 20.0 MW Β· built
- North Anna Unit 2Nuclear Β· 20.0 MW Β· built
- North Anna Power Station Unit 3Nuclear Β· 1,594 MW Β· withdrawn
- Solar project AH1-623, Louisa CountySolar Β· 160 MW Β· withdrawn
- Solar project AF2-063, Louisa CountySolar Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem