United States βΊ Grid βΊ Interconnection queues βΊ Idaho
SOLAR Β· WESTSolar project 689, Gooding County
Solar project 689, Gooding County is a 75.0 MW solar request withdrawn in the West interconnection queue, in Gooding County, Idaho, connecting to Idaho Power Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2022 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 689
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Idaho Power Company
- Connection point (POI)
- US12-BCWF-STWP 138kV Line
- Location
- Gooding County, Idaho
- Technology
- Solar: 75.0 MW
- Total requested
- 75.0 MW
- Service type
- NRIS and ERIS
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 9 December 2022
Location
Marker shows the centre of Gooding County; the queue data does not give exact sites.
Other requests in Gooding County
- Other project 635, Gooding CountyOther Β· 1,000 MW Β· suspended
- Other project 576, Gooding CountyOther Β· 3.2 MW Β· built
- Other project 207, Gooding CountyOther Β· 2.1 MW Β· built
- Hydro project 429, Gooding CountyHydro Β· 1.6 MW Β· built
- Other project 192, Gooding CountyOther Β· 1.5 MW Β· built
- Other project BLCY, Gooding CountyOther Β· 1.5 MW Β· built
- Other project KOYL, Gooding CountyOther Β· 1.3 MW Β· built
- Hydro project 410, Gooding CountyHydro Β· 1.3 MW Β· built
- Hydro project 545, Gooding CountyHydro Β· 0.9 MW Β· built
- Other project FALK, Gooding CountyOther Β· 0.9 MW Β· built
- Hydro project 637, Gooding CountyHydro Β· 0.9 MW Β· built
- Other project MDRR, Gooding CountyOther Β· 0.6 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem