GAS Β· NYISOPSEG Fossil Bergen Unit 2
PSEG Fossil Bergen Unit 2 is a 100 MW gas request withdrawn in the NYISO interconnection queue, connecting to ConEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2008 (completed)
- Withdrawn / abandonedJul 2008 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 274
- Grid region
- NYISO (New York)
- Utility / transmission owner
- ConEd
- Developer
- In City I, LLC
- Connection point (POI)
- W49th Street 345kV
- Location
- New York
- Technology
- Gas: 100 MW
- Total requested
- 100 MW
- Queue status
- Withdrawn
- Entered queue
- 23 January 2008
- Withdrawn
- July 2008
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem