Kitchen is a 750 MW other request withdrawn in the NYISO interconnection queue, connecting to LIPA.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2000 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 37
- Grid region
- NYISO (New York)
- Utility / transmission owner
- LIPA
- Developer
- Caithness Energy, LLC
- Connection point (POI)
- Riverh'd-Brookh'n-Holb'k
- Location
- New York
- Technology
- Other: 750 MW
- Total requested
- 750 MW
- Queue status
- Withdrawn
- Entered queue
- 28 January 2000