United States βΊ Grid βΊ Interconnection queues
GAS Β· ERCOTTImmerman Power Plant
TImmerman Power Plant is a 188 MW gas request built and operating in the ERCOT interconnection queue.
Request details
- Queue ID
- 25INR0223
- Grid region
- ERCOT (Texas)
- Developer
- Lower Colorado River Authority
- Connection point (POI)
- Clear Springs (#7050) and L_Hornsb8_1Y (#7047)
- Technology
- Gas: 188 MW
- Total requested
- 188 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 27 September 2022
- Agreement signed
- 3 March 2023
- Proposed online date
- August 2025
- Came online
- August 2025
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem