TImmerman Power Plant

TImmerman Power Plant is a 188 MW gas request built and operating in the ERCOT interconnection queue.

Queue statusOperating
  1. PlanningQueued Sep 2022 (completed)
  2. ConsentedMar 2023 (completed)
  3. Construction (completed)
  4. OperatingAug 2025 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
25INR0223
Grid region
ERCOT (Texas)
Developer
Lower Colorado River Authority
Connection point (POI)
Clear Springs (#7050) and L_Hornsb8_1Y (#7047)
Technology
Gas: 188 MW
Total requested
188 MW
Study phase
IA
Queue status
Operational
Entered queue
27 September 2022
Agreement signed
3 March 2023
Proposed online date
August 2025
Came online
August 2025

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem