United States βΊ Grid βΊ Interconnection queues βΊ Arkansas
SOLAR Β· MISOSolar project J2800, Columbia County
Solar project J2800, Columbia County is a 200 MW solar request withdrawn in the MISO interconnection queue, in Columbia County, Arkansas, connecting to ENTERGY ARKANSAS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2800
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY ARKANSAS
- Connection point (POI)
- EL DORADO EHV - SAREPTA 345/115KV SW STA 345kV
- Location
- Columbia County, Arkansas
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 15 September 2022
- Proposed online date
- September 2028
- Withdrawn
- July 2025
Location
Marker shows the centre of Columbia County; the queue data does not give exact sites.
Other requests in Columbia County
- Solar project J3131, Columbia CountySolar Β· 300 MW Β· in study
- Solar + storage project J2924, Columbia CountySolar + storage Β· 222 MW Β· in study
- Solar project J2901, Columbia CountySolar Β· 140 MW Β· in study
- Solar project J3917, Columbia CountySolar Β· 100 MW Β· in study
- Solar + storage project J2923, Columbia CountySolar + storage Β· 240 MW Β· withdrawn
- Solar project J2681, Columbia CountySolar Β· 170 MW Β· withdrawn
- Solar project J3624, Columbia CountySolar Β· 155 MW Β· withdrawn
- Battery storage project J3132, Columbia CountyBattery storage Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem