United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

Atascocita BESS

Atascocita BESS is a 10.0 MW battery storage request in interconnection study in the ERCOT interconnection queue.

Queue statusIn planning
  1. PlanningQueued Oct 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Apr 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
25INR0713
Grid region
ERCOT (Texas)
Developer
SMT Houston XIV LLC
Connection point (POI)
Station Name: ATASCOCITA_x000D_ TSP Station Code: AT_x000D_ Load Transformer Name: LD3_x000D_ Bus #: 40130_x000D_ Voltage in kV (Transmission Level): 138
Technology
Battery: 10.0 MW
Total requested
10.0 MW
Study phase
No MRD
Queue status
Active
Entered queue
10 October 2024
Proposed online date
April 2027

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem