BATTERY STORAGE Β· SPP

Battery storage project GEN-2022-146

Battery storage project GEN-2022-146 is a 150 MW battery storage request withdrawn in the SPP interconnection queue, connecting to EDE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2023 (completed)
  2. Withdrawn / abandonedNov 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2022-146
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
EDE
Connection point (POI)
Asbury 161 kV Substation
Technology
Battery: 150 MW
Total requested
150 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
24 February 2023
Proposed online date
December 2027
Withdrawn
November 2023

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem