Pondera King G

Pondera King G is a 925 MW gas request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2007 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedOct 2010 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
10INR0022
Grid region
ERCOT (Texas)
Developer
CPV
Technology
Gas: 925 MW
Total requested
925 MW
Study phase
IA
Queue status
Withdrawn
Entered queue
10 September 2007
Agreement signed
8 October 2010
Proposed online date
August 2017

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem