Surplus; J201 is a 70.0 MW other request withdrawn in the MISO interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- S1002
- Grid region
- MISO (Midcontinent)
- Technology
- Solar: 70.0 MW Β· Other
- Total requested
- 70.0 MW
- Queue status
- Withdrawn
- Entered queue
- 1 October 2020
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem