ONSHORE WIND Β· WEST

Onshore wind project 2007-G1

Onshore wind project 2007-G1 is a 100 MW onshore wind request withdrawn in the West interconnection queue, connecting to WAPA Rocky Mountain Region.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2007 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2007-G1
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA Rocky Mountain Region
Connection point (POI)
Medicine Bow area on the Miracle Mile-Snowy Range 230-kV line
Technology
Wind: 100 MW
Total requested
100 MW
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
7 February 2007
Proposed online date
January 2008

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem