United States βΊ Grid βΊ Interconnection queues βΊ Washington
BATTERY STORAGE Β· WESTBattery storage project G0766, Benton County
Battery storage project G0766, Benton County is a 315 MW battery storage request withdrawn in the West interconnection queue, in Benton County, Washington.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2022 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G0766
- Grid region
- West (non-ISO utilities)
- Connection point (POI)
- Wine Country βΓΓ¬ Midway No 1 230 kV line.
- Location
- Benton County, Washington
- Technology
- Battery: 315 MW
- Total requested
- 315 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 25 July 2022
- Proposed online date
- June 2026
Location
Marker shows the centre of Benton County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in Benton County
- Solar + storage project G0822, Benton CountySolar + storage Β· 4,000 MW Β· in study
- Nuclear project G0998, Benton CountyNuclear Β· 1,120 MW Β· in study
- Solar + storage project G0670, Benton CountySolar + storage Β· 1,000 MW Β· in study
- Solar + storage project G0688, Benton CountySolar + storage Β· 1,000 MW Β· in study
- Solar + storage project G1040, Benton CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G0932, Benton CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G1037, Benton CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G1039, Benton CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G0920, Benton CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G0933, Benton CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G1038, Benton CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G0684, Benton CountySolar + storage Β· 705 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem