United States βΊ Grid βΊ Interconnection queues βΊ Kentucky
SOLAR Β· PJMSolar project AG1-472, Hart County
Solar project AG1-472, Hart County is a 80.0 MW solar request withdrawn in the PJM interconnection queue, in Hart County, Kentucky, connecting to EKPC.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2020 (completed)
- Withdrawn / abandonedSep 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG1-472
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- EKPC
- Connection point (POI)
- Seymour-Cave City 69 kV
- Location
- Hart County, Kentucky
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 30 September 2020
- Proposed online date
- October 2023
- Withdrawn
- September 2023
Location
Marker shows the centre of Hart County; the queue data does not give exact sites.
Other requests in Hart County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem