United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

ONSHORE WIND Β· MISO

Onshore wind project G637, Traverse County

Onshore wind project G637, Traverse County is a 20.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Traverse County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2006 (completed)
  2. Withdrawn / abandonedDec 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G637
Grid region
MISO (Midcontinent)
Connection point (POI)
OTP Graceville - Wapton 115 kV
Location
Traverse County, Minnesota
Technology
Wind: 20.0 MW
Total requested
20.0 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
16 May 2006
Proposed online date
October 2007
Withdrawn
December 2016

Location

Marker shows the centre of Traverse County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Traverse County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem