ONSHORE WIND Β· MISOOnshore wind project G637, Traverse County
Onshore wind project G637, Traverse County is a 20.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Traverse County, Minnesota.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2006 (completed)
- Withdrawn / abandonedDec 2016 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G637
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- OTP Graceville - Wapton 115 kV
- Location
- Traverse County, Minnesota
- Technology
- Wind: 20.0 MW
- Total requested
- 20.0 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 16 May 2006
- Proposed online date
- October 2007
- Withdrawn
- December 2016
Location
Marker shows the centre of Traverse County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Traverse County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem