ONSHORE WIND Β· MISOOnshore wind project J2092, Wright County
Onshore wind project J2092, Wright County is a 100 MW onshore wind request withdrawn in the MISO interconnection queue, in Wright County, Minnesota, connecting to GREAT RIVER ENERGY.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandonedOct 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2092
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- GREAT RIVER ENERGY
- Connection point (POI)
- Dickinson Sub
- Location
- Wright County, Minnesota
- Technology
- Wind: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 3; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 August 2021
- Proposed online date
- October 2025
- Withdrawn
- October 2023
Location
Marker shows the centre of Wright County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Wright County
- Nuclear project G929, Wright CountyNuclear Β· 60.8 MW Β· built
- Other project J020, Wright CountyOther Β· 24.4 MW Β· built
- Nuclear project G725, Wright CountyNuclear Β· 13.0 MW Β· built
- Nuclear project G428, Wright CountyNuclear Β· 10.0 MW Β· built
- Onshore wind project G903, Wright CountyOnshore wind Β· 2,000 MW Β· withdrawn
- Onshore wind project G900, Wright CountyOnshore wind Β· 1,000 MW Β· withdrawn
- Onshore wind project G899, Wright CountyOnshore wind Β· 1,000 MW Β· withdrawn
- Battery storage project J1446, Wright CountyBattery storage Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem